I was running a few final errands before heading to the airport.
CSX had been working on making CP83 in Palmer, Massachusetts compliant with positive train control requirements, which has coincided with commissioning new signal hardware.
By the time I return, the old signals will likely have been retired and the new system up and working.
Crossing the South Main Street bridge in Palmer, I spotted a New England Central local working the diamond, and a CSX intermodal train (Q022) waiting to the west.
This gave me enough time to set up and made a few final photos of the transitional arrangement at CP83 in Palmer.
Changeable lighting made for patches of direction sun under a partial blanket of cloud. I tried to use these sunny spots to my best advantage since the train was moving slowly through the interlocking.
Tracking the Light Posts Every Day.