Since my first visits to the Highway F bridge over the Wisconsin Central tracks at Byron, Wisconsin in 1994, the railroad here had been functionally transformed.
In the late 1990s, two main track (both lines signalled for bi-directional operation) replaced single main track, the old signal code lines were removed, while a modern highway bridge was installed in the place of the old span.
Canadian National acquired Wisconsin Central two decades ago, and today the freight trains are significantly longer than they were 25 years ago.
It was snowing hard when Kris and I paused to watch this southward CN double stack train ascending toward the summit of Byron. I thought back to Wisconsin Central days, and scanned the comparison view from 1994 made from a similar vantage point on the old bridge.
Tracking the Light Posts Every Day!